SURXTX | Master Programmer


The SURXTX is an add-on to the security system that makes it easier to update. The concept from the Security System carries over to the Security Manager with a fresh, simpler, and still secure way to add or delete users from the Security System.

MASTER PROGRAMMER

The SURXTX is an add-on to the security system that makes it easier to update. The concept from the Security System carries over to the Security Manager with a fresh, simpler, and still secure way to add or delete users from the Security System. Comes with software that runs on MS Windows.


Features:

  • Add, delete users
  • Change codes
  • Adjusting timing
  • Copy Memory
  • Paste Memory
  • Upload and view existing users
  • USB to RS485 converter

Dimensions:

  •  2.205″W x 3.150″H x 0.965″D  |  6 FEET USB CABLE
SKU: SURXTX Category:

SHOPPING CART

close